MOVE sizes the onboard battery, places and rates the chargers, and simulates the operation across a full shift and the life of your mine, whether the site is already running or greenfield. Already chosen an electric truck? MOVE takes its spec and optimises the charging strategy instead.
Free during the research trial · No payment details required
The algorithms behind MOVE were developed through the MOVE research program, a $2.1M+ initiative of the Future Battery Industries CRC led by Adelaide University, in partnership with BHP, IGO, MRIWA and other industry partners.
MOVE formulates your mine's electrification as a mixed-integer nonlinear program and solves it with proven optimisation solvers. Battery size, charger placement and the shift operation are decided together, because on a real haul cycle they all depend on each other. With a known truck, battery size becomes an input and charge frequency becomes the decision.
// decision variableschoose e_cap, charger_site, p_ch, n_trips// known electric truck?given e_cap → choose charge_freq, p_ch, n_trips// subject to, on every segment k:SOCk+1 = SOCk − ek(grade, mass) + chargekSOCmin ≤ SOCk ≤ e_cap p_ch ≤ max_prSOCstart = SOCend // repeatable shift
Model one representative shift, then extend it across the mine's life under scenarios you control: production ramp, energy prices, fleet growth and more.
Sweep any parameter for any scenario: energy price, battery cost, mine life, grade. Response curves and tornado charts rank what actually moves the decision.
Upload a haul-profile CSV, or design a simplified haulage route right in the app. Works for existing operations and greenfield mines alike.
CAPEX, OPEX and lifecycle cost for Fast Charging, Battery Swapping and Trolley Assist, all on the same route, truck and shift assumptions, so the comparison is fair.
Discounted cash flow over mine life: charger and battery capex, energy cost, battery replacement cycles, inflation and discount rate, all configurable.
Export every result, chart and sensitivity study as a polished, AI-written PDF report, ready to hand to stakeholders and investment committees.
From a haul-route sketch to an optimised, exportable techno-economic report, all in the browser.
Results dashboard. Optimal onboard battery size, charger location and power, full cost breakdown, and the state-of-charge and shift timeline for the chosen scenario. For a known truck, the dashboard reports the optimised charge frequency in place of a solved battery size.
Sensitivity and tornado. Vary any assumption across a range and rank which ones move cost and productivity the most. The longest bar is the biggest driver.
Route designer. Upload a CSV or sketch the haulage route, then mark where each charging technology may be installed.
MOVE models every viable strategy on equal footing, so the technology choice is an output, not an assumption.
High-power DC charging at the shift-change location. The optimiser sizes the battery and charging schedule together for maximum shift productivity.
LiveDepleted packs exchanged at dedicated stations, eliminating charge-wait time. Models station CAPEX, spare pack inventory and productivity impact.
Coming soonOverhead catenary on steep ramps powers the motors directly and recharges the battery, removing the hardest energy-demand segments from the sizing problem.
Coming soonMOVE is the commercial translation of a four-year research program on mine electrification (FBI CRC Project No. 028 · MRIWA M0533u), concluded in 2025.




A selection of technical reports delivered to BHP and IGO through the MOVE program: charging infrastructure design, fleet energy management, and mine power system design. Full reports remain confidential to the program partners.
Upload a haul-profile CSV, or sketch a simplified route in the app, for an existing operation or a greenfield mine.
Retrofit a diesel truck, or enter the spec of an electric truck you already have in mind, set the battery and charger limits, and define the shift structure.
The solver sizes the battery and chargers, or for a known truck chooses the charging strategy, then simulates the operation across the life of the mine under scenarios you control.
Review CAPEX, OPEX, lifecycle cost and sensitivity side by side, then export it all as an AI-generated PDF report.
Upload a haul profile and get a full technology comparison. Free during the research trial, with no payment details required.
Questions? Contact us · contact@vornu.energy